more progress this week

john is still hard at work trying to wrap up the work before baby Schmitz arrives in 12 short weeks. I was actually able to help out this weekend and assisted in the track light hanging. tile in both bathrooms is in, grouted and sealed. john is excited to be able to finally look at finishing the bathrooms. me too since I have to use it a lot.
upstairs bathroom
downstairs front bathroom
light over the stairs (Guido and John actually did this one)
track fixture up with one light...3 others will be installed soon